Calculator

Concrete Bag Calculator

Count packaged concrete bags from cubic yards you already know.

Your inputs

Bags to buy

90

An 80-pound bag yields 0.60 cubic feet and a 60-pound bag yields 0.45. One cubic yard is 27 cubic feet.

Bags
90

Formula

The page rounds up to a whole bag:

bags = ceil(cubic yards × 27 / bag yield)

Those yields are the figures printed on typical US packaged concrete. The concrete page is the one that starts from length, width, and thickness.

Assumptions

  • The yardage is the volume you intend to place.
  • The bag yield matches the brand you buy.
  • A partial bag is bought whole.

Worked example

Two cubic yards of the 80-pound mix need 90 bags.

Input definitions

Bag yield
The wet volume one bag is supposed to make, in cubic feet.
Cubic yard
27 cubic feet. Forty-five of the 80-pound bags fill one yard at the 0.60 yield.

Limitations

Hot weather, too much water, and a yield printed differently on the bag all change the count.

Questions

Why 45 bags per yard?

27 divided by 0.60 is 45. The 60-pound bag yields 0.45 cubic feet, which is 60 bags per yard.

What if I only know the slab size?

Use the slab page for cubic yards, or the concrete page if you want bags directly from the box.

Related

Related calculators

Concrete

See every calculator in Concrete.

Browse Concrete